Tuesday, Jun. 13th 2017

Industry Success: Hygiene – June 2017

Industry:

Hygiene

Application:

Adult Diaper Line

Challenge:

MIR originally provided a belt on the customer’s application that was producing 500 products per minute. Over time, improvements to the customer’s machine increased production speeds to 1,000 products per minute. This led to higher usage of the current belt. MIR worked with engineering to determine an improved solution for the increased speeds.

Value-Added Solution: MIR #1872149

  • Increased belt life
  • Reduced belt cost
  • Reduced production waste
  • Reduced production delays

Validated CI Savings:

$22,651 in annual savings.

Contact us to see how we can turn your challenges into successes.